The project includes the following technical activities:
- Conduct a topographic survey, including visual and photographic site assessments.
- Develop a geometric design proposal for the North Node, including earthworks and a preliminary cost estimate.
- Conduct a Traffic Impact Study and traffic simulations.
- Establish project design grades based on the topographic survey.
- Develop the roadway signage plan.
Alignment with Strategic Planning
The project aligns with Pillar 3 of the Baja California State Development Plan: Territorial Development and Sustainable Mobility, and contributes to Objective 3.2, focused on improving roadway infrastructure and promoting safe and efficient mobility.
It also addresses action lines related to roadway modernization, congestion reduction and stronger regional connectivity.
According to the project documentation, the initiative seeks to increase roadway capacity, reduce travel times and improve safety along a strategic corridor, while also improving access for commercial, tourism and logistics activities.